Repository logo
  • English
  • Català
  • Čeština
  • Deutsch
  • Español
  • Français
  • Gàidhlig
  • Italiano
  • Latviešu
  • Magyar
  • Nederlands
  • Polski
  • Português
  • Português do Brasil
  • Suomi
  • Svenska
  • Türkçe
  • Tiếng Việt
  • Қазақ
  • বাংলা
  • हिंदी
  • Ελληνικά
  • Yкраї́нська
  • Log In
    New user? Click here to register.Have you forgotten your password?
Repository logo
  • Communities & Collections
  • All of DSpace
  • English
  • Català
  • Čeština
  • Deutsch
  • Español
  • Français
  • Gàidhlig
  • Italiano
  • Latviešu
  • Magyar
  • Nederlands
  • Polski
  • Português
  • Português do Brasil
  • Suomi
  • Svenska
  • Türkçe
  • Tiếng Việt
  • Қазақ
  • বাংলা
  • हिंदी
  • Ελληνικά
  • Yкраї́нська
  • Log In
    New user? Click here to register.Have you forgotten your password?
  1. Home
  2. Browse by Author

Browsing by Author "Ozobeme, A.A."

Now showing 1 - 1 of 1
Results Per Page
Sort Options
  • No Thumbnail Available
    Item
    3D TIME-LAPSE GEOPHYSICAL IMAGING OF FERTILIZER-INDUCED SOIL AND GROUNDWATER CONTAMINATION IN OGHARA, DELTA STATE, NIGERIA
    (Zibeline International Publishing, 2025-07) Ozobeme, A.A.; Osisanya, W.O.; Airen, O.J.; Eyankware, O.M.; Iluobe, E.O.
    Fertilizer contaminants can persist in subsurface environments, making remediation efforts costly and time consuming, particularly in areas with shallow aquifers and permeable soils. This study applied time-lapse geophysical methods to assess fertilizer-related soil and groundwater pollution in agricultural regions of Oghara, Delta State, Nigeria. Eight 2-D electrical resistivity imaging (ERI) surveys were conducted, Including 16 grid-aligned lines across the Presco lowland and upland areas which were collated to form the 3 D models, along with a control line. Data were processed using RES3DINV and ZondRes3D to produce the 3-D resistivity models. Three-dimensional slices illustrated the downward migration of contaminants over time. Analysis of time-lapse data showed maximum vertical migration rates of 216.7 cm/month and horizontal rates of 750.0 cm/month at the initial site. At the second site, rates reached 122.5 cm/month vertically and 500.0 cm/month horizontally. Taking into account local hydrological and geological conditions, the contaminant plumes are projected to reach the dry sandy layer within 0.5 to 1 year.

DSpace software copyright © 2002-2026 Abba & King Systems LLC

  • Cookie settings
  • Privacy policy
  • End User Agreement
  • Send Feedback